top of page
St. Norbert College
De Pere, WI
Complete planning, design, and construction services were provided for all site features on this $12M stadium project completed in 2010 ( approximately $3.5M in site work) Major site components include:
We provide master planning, landscape architecture and design, and project management services. In addition, we offer site and facility surveying, maintenance and management services.
All-weather running track
-
Full NCAA Compliant 9-lane running track with “sandwich system” surface (Polyurethane base mat with full-pour surface)
-
Complete field event facilities including hammer/discus, steeple chase, shot put, javelin, long/triple jump and pole vault
-
Continuous track edge drain
Synthetic Turf Stadium Field
-
Synthetic infill turf
-
NCAA football markings
-
Custom logos and lettering
-
Utility Design
-
Storm water management plan and design
-
Wetland permitting
-
Landscape plan
"It was certainly a pleasure working with the entire Rettler Team on the Schneider Outdoor Athletic Facility project. From developing the site plan to identifying the appropriate playing surface to the completion of the project, feeling confident that we had an experienced, professional group advising us the entire way was very reassuring. The end product speaks for itself."
Tim Bald
St. Norbert College
bottom of page