Goerke Field

Stevens Point, WI

2010

Excellence in Design

and Construction

Distinguished Single Field Facility
Rettler Corporation provided planning, budgeting, design, bidding administration and construction management services to facilitate the redevelopment of the poly-urethane base mat installation as part of the running track, and jumping events at Goerke Park for The Stevens Point Area Public School District.  Included as part of the track resurfacing project was a red structural spray application. Rettler Corporation began working with the school district and the City of Stevens Point in 2018 to develop a plan for replacing the aged running track surface.  
  • 8 Lane Running Track Resurfacing
  • Long Jump – Triple Jump Runway Redevelopment and Resurfacing 
  • High Jump D-Area and Pole-vault Redevelopment and Resurfacing.

3317 Business Park Drive
Stevens Point, WI 54482-8834

Phone: 715.341.2633

Email: info@rettler.com

  • Facebook
  • LinkedIn Social Icon

Your Vision. Our Design.

Copyright 2020 Rettler Corporation. All Rights Reserved.